Irrigation RFQ desk · Mon–Fri 08:00–17:30 CET [email protected] · +31 341 416 854

Compact procurement fields

Ridder RFQ Checklist for agri irrigation equipment

Capture crop, acreage, utilities and delivery window before pricing. This page reuses a field-service planning structure — but every block is rewritten for RFQ clarity, not sustainability claims.

Procurement checklist on clipboard beside irrigation fittings

Clear requirements. Faster RFQ decisions.

Ridder asks for the same compact field set on every irrigation inquiry: crop plan, hectares, power supply, design flow and the week water must be available. Incomplete briefs bounce once with a filled example instead of a vague follow-up chain.

Checklist goals

What a complete irrigation RFQ should prove

Crop & acreage

Name the crop, bed or canopy layout, and coverage area in hectares or acres so emitter and pivot geometry can be sized.

Utilities & flow

State voltage, phase, water source and target flow in m3/h. VFD pump packages stall without utility notes.

Delivery window

Give the planting or irrigation start week. Parts staging and commissioning slots lock to that calendar.

Required RFQ fields

Copy these fields into your purchase request

1. Crop planRequired

Crop type, row spacing or canopy, greenhouse vs open field.

2. Coverage areaRequired

Hectares or acres; note irregular parcels that may need end guns.

3. Design flowRequired

Target m3/h or known emitter L/h × lateral count.

4. UtilitiesRequired

Voltage/phase, water source (well, canal, municipal), filtration status.

5. Delivery windowRequired

Week water must be available; note commissioning access days.

6. Optional add-onsIf needed

Fertigation tank capacity, EC/pH probes, controller I/O, spare kits.

Procurement proof

Documents that speed dealer and grower approvals

ISO 9001 build sheet
CE pack index
Flow test record
Controller I/O map

RFQ limits to expect

  • Quotes without utility voltage are held as provisional until power notes arrive for VFD pump packages.
  • Drip irrigation RFQs with unknown silt load receive a filtration assumption that must be confirmed on site before drip tape emitters stay in the 0.4–2.0 L/h band.
  • Center pivot RFQs on irregular parcels may exclude corner fill unless end-gun geometry and working width near 24 m modules are provided.
  • Fertigation skids that omit tank capacity (L) and probe type cannot lock EC/pH I/O maps on the first revision.

Example drip brief

40 ha tomato rows, drip tape 1.0 L/h emitters, header design 120 m3/h, disk filtration, 400 V three-phase, fertigation optional, delivery before March transplant week.

Example pivot brief

60 ha grain circle, center pivot span modules ~24 m, electric tower drive with VFD option, end gun undecided, parts staging two weeks before first irrigation day.

Submit an RFQ with the checklist filled

Paste the six fields into the contact form or inquire modal. Ridder replies with a structured irrigation quote path.

Send Completed RFQ